OHS Auditing and Surveillance Checklist

06 June 2001

Construction Industry
OH&S Auditing and Surveillance Checklist

1. Management Responsibility

* Is the OHS Policy documented
* Communicated at induction training
* Displayed in prominent locations

Does the OHS policy provide:

* A framework for setting and reviewing OHS objectives and targets
* Commitment to meet legal and contractual requirements
* Commitment to continual improvement
* Commitment to providing a healthy and safe work environment for everyone on the project

Site OHS Responsibility

* Has a senior site manager been appointed Site Safety Representative with responsibility for setting up and maintaining the site health and safety system?
* Is the Site Safety Representative qualified to carry out the role?
* Is the Site Safety Representative a full-time member of the Site Management Team?

Assigned OHS Responsibilities

* Have OHS responsibilities been assigned to site management personnel? Do they include the following:
* Personnel have OHS responsibilities assigned and are qualified to carry them out
* Verification requirements
* Compliance with OHS&R legislation, regulations, standards and codes
* Induction, task and refresher training
* Development and implementation of emergency procedures
* Preparing safe work method statements and ensuring compliance with safe working rules
* Assessment of subcontractors' and suppliers ability to comply with OHS&R requirements
* Quarantining unsafe work areas, materials, plant and equipment
* Investigating and reporting incidents and accidents and initiating corrective action and prevention actions
* Rehabilitation of injured employees

2. Subcontracting and Purchasing

Are OHS requirements included in the purchasing and hiring procedure for the site?

* Are there purchasing and hire documents which show that these OHS requirements have been used in the selection of plant, equipment and materials that are used on the site?
* Have sub-contractors been selected on the basis of their ability to comply with OHS&R requirements
* Is there a procedure that covers monitoring of subcontractors' OHS performance
* Have sub-contractors been asked to provide their own site safety management plan and safe work method statements?
* Has RTA approval been obtained for hire of subcontractors where this is required?
* Is there a list of preferred subcontractors and suppliers?

3. Process Control

Does the Project OHS&R Plan have components which deal with site specific safety issues?

* Management responsibility
* OHS Training
* Incident Management
* Site safety rules
* Safe work method statements
* Is there a site procedure for identifying hazards, and accessing and controlling risks?
* Has this procedure been used to develop risk control plans as required under 4.3.1 of G22
* Have safe work method statements been developed for hazardous tasks identified at the site (such as the hazards listed at 4.3.2 in G22)
* Are these safe work method statements being followed?

4. Inspection and Testing

* Is there a procedure for doing regular inspection and testing at the site?
* Does the inspection and testing procedure cover equipment and work processes in use at the site and products and materials brought onto the site?
* Are there inspection and testing records available which indicate the procedure is being followed?
* Do these records show that health and safety checks are being carried out at least weekly (as per 4.4.1 of G22)
* Do appropriately qualified people carry out inspection and testing/
* Are checklists and reporting forms used to support the inspection and testing procedure?
* Is corrective action from inspections followed up and corrections made in a timely manner?

Does inspection and testing at the site cover an appropriate spread of safety issues, including:

* Condition of the worksite (ie housekeeping)
* Safe work method procedures exist for hazardous tasks and are followed
* Safety of materials/products/equipment brought onto site
* Compliance with site safety procedures
* Electrical installations and equipment
* Plant and equipment
* Availability and use of personal protective equipment
* Control of vehicle movements on site and protection from traffic hazards
* Availability and standard of site first aid and amenities
* Emergency response

5. Control of OHS Issues

* Is there a procedure in the Project OHS&R Management plan for identifying and eliminating unsafe work practices and unsafe work areas on the site?
* Is there a procedure onsite for accident and incident report
* Does the procedure spell out that corrective action should be taken after an accident and incident?
* Do the accident and incident reports who that corrective action is being carried out?
* Are accidents and incidents notified to designated people inside and outside the organisation?
* Is there a rehabilitation program operating on site which promotes early and safe return to work?
* Have suitable other duties been identified for workers undertaking rehabilitation?
* Has a process of site communication been set up, including communication with subcontractors, so that safety issues and emergencies can be quickly notified and responded to?

Does the site management plan contain:

* Details of emergency response and responsibilities
* Key personnel with contact details
* Details of emergency services
* A communication strategy for the site and for external contacts
* Where information on hazardous materials is kept
* Has the contractor complied with the provisions of the OHS (Committees in the Workplace) Regulation 1999?

6. Corrective Action

* Is there a procedure in the Project OHS&R Management Plan which covers taking corrective action (after activities like site audits, inspections and investigations)?
* Has responsibility for carrying out correction action been assigned to site management personnel?
* Is corrective action reported to senior managers onsite and within the organisation?
* Does corrective action lead to improvement in OHS&R performance?
* Can improvement be tracked from relevant audit, inspection and investigation reports?

7. Handling, Storage, Packaging and Delivery

* Is there a policy and procedure onsite of materials handling?
* Is there a policy and procedure onsite for manual handling?
* Is there evidence these policy and procedures are being followed (records of hazard identification and implementation of control measures)

Is there a policy and procedure onsite for storage, labeling and handling hazardous substances?

* Does this policy and procedure include having a site register for MSDS?
* Does this policy and procedure include giving relevant staff training in hazardous substances uses?
* Where it is required, are people who operate plant and equipment certified to do so?
* Is there a procedure which screens new products, plant and equipment for health and safety hazards before they enter the site?
* Is there a procedure which screens new products, plant and equipment for health and safety hazards before they enter the site?
* Is there evidence in purchasing records which shows this procedure is used?

8. Training

* Is there a site training program?
* Does site induction training comply with Construction Safety Amendment (Amenities and Training) Regulation 1998?
* Does everyone at the site get training in emergency procedures, including short stay workers and visitors?
* Are future training needs on the site provided for?
* Are OHS trainers qualified to deliver training?
* Are OHS &R training records kept onsite?
* Is OHS&R information circulated onsite?

9. OHS&R Records

Is there a site procedure for the filing, retrieval and retention of OHS&R records?

Are relevant OHS&R records kept, such as?

* Audit and inspection reports
* Accident/incident reports with analysis
* Corrective action reports
* Accident statistics
* Minutes of OHS meetings
* Induction and training records
* OHS qualifications and licenses held by staff
* Records of hazardous goods and substances
* Safety equipment records
* Subcontractor site safety plans and safe work method statements

10. Design

* Is there a procedure for considering OHS&R issues during later design work and when design changes are needed?
* Do designers have contact with site personnel to discuss OHS&R issues during later design work?
* Do designs contain OHS&R documentation for the guidance of site personnel?

11. OHS&R Reviews

* Is there a site procedure for planning and carrying out internal reviews to verify OHS&R processes match company plans?
* Are internal reviews carried out to a schedule?
* Does the schedule allow all eleven system elements to be reviewed during the project?
* Are internal reviews carried out by people with appropriate skills and knowledge of the system?
* Are outcomes from internal reviews examined by project management staff?

For further information

Contact : Susan Sheather
Phone : +61 2 9264 1691
Email : organise@labor.org.au
WWW : http://ohsnet.labor.net.au/ohsnet/news

[ up to OHS NET News/Info Index ]

OHS NET
YouthSafe
Training
OHS.NET is an initiative of the Labor Council of NSW
Labor Council

Privacy Statement
OHS NET is supported by the Workcover Authority of NSW.

Photos kindly supplied by National Occupational Health & Safety Commission.

This site was created and powered by Social Change Online